unknown
Plan de rehabilitación de la UCV reactiva ascensores y montacargas en Ciudad Universitaria
Un total de 11 ascensores y cinco montacargas de carga pesada ha sido reactivado por medio del plan de rehabilitación de la Ciudad Universitaria de Caracas, alcanzando un nuevo hito.

TL;DR
- 11 elevators and 5 heavy-duty freight elevators reactivated.
- Elevators in Engineering, Pharmacy, Dentistry, Architecture, Rectorate, and Central Library are operational.
- Modernization of a twelfth elevator in the Faculty of Dentistry is underway.
- Technical team replaced electronic boards and optimized machine rooms.
- Part of a larger intervention at the Central University of Venezuela (UCV).
- Rehabilitation includes 75 buildings, over 1,300 spaces, roof waterproofing, and floor restoration.